Guides · For HMO investors · Updated 13 November 2026

HMO change of use costs £732 from 8 December 2026, up £122

Planning fees rise on 8 December 2026 under SI 2026/1192, made law on 10 November 2026. An Article 4 HMO conversion or a large HMO application pays the category 14 fee: £610 for applications made by 7 December 2026, £732 after. Fees rise another 3.5% on 1 April 2027. England only.

Up most
  • Section 73, major development: £2,076 to £3,150
  • Discharge of conditions: £309 to £435
  • Reserved matters after a full fee: £610 to £749
  • Prior approval: £249 to £310
Up least
  • Householder extension: £548 to £575
  • Outbuildings and fences: £272 to £285
  • Section 73, any other case: £608, unchanged
Made law. The Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) (Amendment and Transitional Provision) Regulations 2026, SI 2026/1192, were made on 10 November 2026 after a draft had been approved by resolution of each House of Parliament, were published on legislation.gov.uk on 13 November 2026, and come into force on 8 December 2026 (regulation 1(2)).
HMO change of use, category 14One application, three dates Until 7 December 2026£610current fee, from 1 April 2026From 8 December 2026£732up £122 (20%), SI 2026/1192From 1 April 2027about £7583.5% indexation, our arithmetic England only. From the two MHCLG schedules.
£610 to £732material change of use, the fee an HMO conversion pays (category 14)
+20%£122 more per application from 8 December 2026
8 Decembercommencement date, regulation 1(2) of SI 2026/1192; applications made before it pay the current fee (regulation 12(1))
+3.5%annual indexation on 1 April 2027, the next fee change date
The short version

If you need planning permission for an HMO, a valid application made on or before 7 December 2026 costs £610; from 8 December 2026 it costs £732. That is the material change of use fee for a C3 to C4 conversion inside an Article 4 area and for any large HMO of 7 or more. A lawful development certificate for an existing HMO use costs the same; a proposed-use certificate half. The rises are set nationally in SI 2026/1192, made on 10 November 2026 and in force on 8 December 2026.

Who pays the change of use fee

Article 4 conversions

Where a council's Article 4 direction has removed the permitted development right, turning a family home into a small HMO (3 to 6 people) is a material change of use and needs a full application at the category 14 fee. See HMO Article 4 by council.

£610 to £732
Large HMOs

An HMO for 7 or more people is sui generis everywhere in England, so it always needs permission for the change of use: the same category 14 fee, Article 4 or not.

£610 to £732
Lawful development certificates

Proving an existing HMO use is lawful costs the full application fee; a certificate for a proposed use costs half. Both move with the category 14 figure.

£610 or £305 now

Before and after, every fee that touches a landlord

ApplicationFrom 1 April 2026From 8 December 2026ChangeUnit
HMOs and changes of use
Material change of use (category 14): C3 house to C4 small HMO in an Article 4 area, or any large HMO of 7 or more (sui generis)£610£732+20%per application
Lawful development certificate, existing use (for example an HMO already in use): same as the full application fee The schedule sets this as 'Same as Full Application fee'; the figures are the category 14 fee.£610£732+20%per application
Lawful development certificate, proposed use: half the full application fee 'Half the Full Application fee'; the figures are half the category 14 fee.£305£366+20%per application
Change of use to separate dwellings, fewer than 10 (category 12): house to flats Where a single house becomes two or more dwellings the fee is per additional dwelling; in other cases per dwelling. 10 to 49 dwellings: £659 to £799 each.£610£700+14.8%per additional dwelling
Householder works
Alteration or extension of a single house (category 6)£548£575+4.9%per application
Alteration or extension of two or more houses (category 6)£1,083£1,130+4.3%per application
Works within the curtilage: outbuildings, fences, walls (category 7)£272£285+4.8%per application
Conditions and amendments
Vary or remove a condition (section 73), householder£89£112+25.8%per application
Vary or remove a condition (section 73), major development£2,076£3,150+51.7%per application
Vary or remove a condition (section 73), any other case£608£608no changeper application
Discharge of conditions, householder£89£125+40.4%per request
Discharge of conditions, any other case£309£435+40.8%per request
Non-material amendment, householder£46£53+15.2%per application
Non-material amendment, any other case£309£360+16.5%per application
Certificate that it is lawful not to comply with a condition£309£360+16.5%per application
Reserved matters where the full application fee was already paid£610£749+22.8%per application
Prior approval
Prior approval, householder: larger rear extension (Part 1 Class A) or upward extension (Class AA)£249£310+24.5%per application
Prior approval, commercial to residential (Part 3 Class MA)£260£323+24.2%per proposed dwelling
Prior approval, other buildings to dwellings (Part 3 Classes M, N, Q)£249£310+24.5%per application
Prior approval, Classes M, N, Q with building operations£536£667+24.4%per application
All other applications for prior approval£249£310+24.5%per application

Current fees from MHCLG's 1 April 2026 schedule; 8 December fees checked against SI 2026/1192 on 13 November 2026 (the provision for each row is in SOURCES.txt); percentages are our arithmetic. A flat £310 fee is introduced for certain prior approval applications that previously had no fee (regulation 4(i) of SI 2026/1192, inserting regulation 14(1)(d) into the 2012 Regulations: 'for any other application under that Schedule, £310'). Some early commentary says the householder prior approval fee (larger rear extensions, upward extensions) is new. The 1 April 2026 schedule already lists it at £249; from 8 December it is £310.

What to do before 8 December 2026

A fee is locked when the application is made, which in practice means validated: a draft on the portal or a pre-application enquiry does not count. Check the council's validation checklist (plans, forms, ownership certificate, CIL form where required) and submit with the fee paid.
Councils have validation backlogs; the cut-off is the date the application is made, so do not leave it to the last week of November.
For a C3 to C4 change outside an Article 4 area no application is needed and there is no fee; check the council page first.
Large HMO (7 or more) and Article 4 conversions planned for early 2027: the saving from applying first is £122 per application, and about £148 against the April 2027 figure (our arithmetic).
Section 73 and discharge-of-condition requests on existing permissions rise more in percentage terms than the application fee; get them in too.
Wales and Scotland: unaffected; different fee regimes.

The regulations: SI 2026/1192, made 10 November 2026

The Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) (Amendment and Transitional Provision) Regulations 2026, SI 2026/1192. Made 10 November 2026 after a draft was approved by resolution of each House; published on legislation.gov.uk 13 November 2026. Regulation 1(2): "These Regulations come into force on 8th December 2026." Regulation 12(1): The amendments made by regulations 3 to 11 do not apply to (a) any application made before the commencement date, or deemed to have been made in connection with an enforcement notice issued before the commencement date, (b) any request made before the commencement date, or (c) any site visit which takes place before the commencement date. Regulation 12(2) moves the annual indexation 'fee change date' in regulation 18A of the 2012 Regulations to 1st April 2027.

The instrument amends the un-indexed base text of the 2012 Regulations, so the amounts it replaces (for example £298 in regulation 16(1)(b)) are lower than the current indexed fee on MHCLG's table (£309). The 'before' column on this page is the current indexed fee from MHCLG's 1 April 2026 schedule; the 'from 8 December' column is the amount written in the instrument. The 3.5% indexation on 1 April 2027 is MHCLG's stated figure: the instrument sets the date (regulation 12(2)), not the percentage. Read the instrument.

Questions

Which fee does an HMO conversion pay?

A material change of use, category 14 of the fee schedule: £610 now and £732 from 8 December 2026. That covers a family home (C3) to a small HMO (C4) where an Article 4 direction has removed permitted development, and any large HMO of 7 or more people (sui generis), which always needs permission. Where no Article 4 applies, a C3 to C4 change is permitted development and there is no fee.

Do applications already in by 7 December pay the old fee?

Yes, under regulation 12(1) of SI 2026/1192: the new fees "do not apply to any application made before the commencement date", and the commencement date in regulation 1(2) is 8 December 2026. An application is made when it is valid, not when it is drafted or when a pre-application enquiry goes in, so check the council's validation checklist and pay the fee in time.

Is this definitely happening?

Yes. The regulations were made on 10 November 2026 after a draft was approved by both Houses of Parliament, were published on legislation.gov.uk on 13 November 2026 as SI 2026/1192, and come into force on 8 December 2026 (regulation 1(2)). Every 8 December figure on this page was checked against the instrument's text on 13 November 2026; the provision for each is in SOURCES.txt.

What happens on 1 April 2027?

The new fees are indexed by 3.5% from 1 April 2027 (the 3.5% is MHCLG's stated figure in its schedule; regulation 12(2) of SI 2026/1192 moves the annual fee change date to that day but sets no percentage). We have not published April 2027 figures as fees; the calculator shows an estimate, labelled as our arithmetic, when you choose that date.

What about lawful development certificates?

The schedule keeps the rule: an existing use certificate costs the same as the full application fee (so £610 rising to £732 for an HMO use), a proposed use certificate half of it (£305 rising to £366).

Does this apply in Wales or Scotland?

No. The regulations extend to England and Wales but amend the England fee regulations only; Wales, Scotland and Northern Ireland set their own planning fees. Kerbio's Welsh council pages do not carry the fee line.

Is this advice?

No. It is what the two MHCLG schedules and SI 2026/1192 say, with the arithmetic shown. Fees are set nationally; councils do not vary them. Confirm the fee with the council's planning portal when you apply.

About this guide

Written by Kerbio, a small independent UK tool for property investors, on 13 November 2026 from the two MHCLG fee schedules and SI 2026/1192. Every fee is in the schedules and the instrument; the percentages are ours. Not legal advice.

Kerbio is a Chrome extension that puts Article 4, licensing, the council's HMO register and sold prices on the listing you are reading.

See the extension
The Kerbio panel on an example listing page, with live data for postcode LS6 3AL

Sources

  1. The Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) (Amendment and Transitional Provision) Regulations 2026, SI 2026/1192, made 10 November 2026 (legislation.gov.uk); contents
  2. Planning application fees (MHCLG guidance page, updated 10 November 2026)
  3. Planning fees: national increases from 8 December 2026 (PDF)
  4. Planning fees: annual indexation from 1 April 2026 (PDF)

Checked 13 November 2026. Quotations and figures in SOURCES.txt. General information, not legal advice. England only.