Kerbio
Calculators · Planning fees · Updated 13 November 2026

What your planning application costs before and after 8 December: calculator

The fee for a planning application in England by type and date: under the current schedule, under the 8 December 2026 schedule (SI 2026/1192) and an estimate for 1 April 2027, with the saving from applying before 8 December. Nothing you type leaves your browser.

Your application

Dates that matter. Applications made before 8 December 2026 pay the current fee (regulation 12(1) of SI 2026/1192). The 8 December fees are made law in SI 2026/1192, in force 8 December 2026. The April 2027 figure is our arithmetic on the 3.5% indexation the schedule announces.

The fee

£0on the date you chose
£0current schedule, applications made by 7 December 2026
£0from 8 December 2026, SI 2026/1192
£0from 1 April 2027, estimate (plus 3.5%)
£0saved by applying before 8 December 2026
0%change on 8 December 2026

Figures from MHCLG's schedules; the April 2027 line is ours. England only. Not advice. What changes on 8 December.

How it works

Two schedules, one date

Each type has a fee in the 1 April 2026 schedule and a fee in the 8 December 2026 schedule. The date the application is made decides which applies (regulation 12(1) of SI 2026/1192).

Per dwelling types

Change of use to flats (category 12) and Class MA prior approval are charged per dwelling; enter the number and the calculator multiplies. Category 12 from a single house is per additional dwelling.

April 2027

The schedule says fees rise 3.5% on 1 April 2027. The figure shown is the December fee times 1.035, rounded, and is labelled as an estimate until MHCLG publishes the table.

Questions

Where do the figures come from?

The 1 April 2026 figures are MHCLG's "annual indexation from 1 April 2026" schedule; the 8 December 2026 figures are MHCLG's "national increases from 8 December 2026" schedule, published 10 November 2026, and were checked against SI 2026/1192 on 13 November 2026. The April 2027 figure is our arithmetic: the December fee plus 3.5%, rounded to the pound, because the schedule says fees will be indexed by 3.5% on 1 April 2027 but has not published that table.

What counts as the application date?

The day the application is made, which the council treats as the day it is valid with the fee paid. Regulation 12(1) of SI 2026/1192 keeps the current fee for any application made before 8 December 2026; a draft on the portal or a pre-application enquiry is not an application.

Are the 8 December fees definite?

Yes. SI 2026/1192 was made on 10 November 2026 after a draft was approved by both Houses, and comes into force on 8 December 2026 (regulation 1(2)). The December figures here were checked against the instrument on 13 November 2026.

Which option is my HMO?

A family home to a small HMO (C4) inside an Article 4 area, or any HMO of 7 or more people, is a material change of use (category 14). Outside an Article 4 area a C3 to C4 change needs no application and no fee. A house split into flats is category 12, charged per additional dwelling.

Is this advice?

No. Fees are set nationally in the schedules; this page reads them back by type and date. Councils do not vary them, but they do decide validity, so confirm with the council's portal when you apply.

Other free tools

Sources: the two MHCLG schedules and SI 2026/1192, listed in the guide and its SOURCES.txt. Checked 13 November 2026.

The monthly landlord changes bulletin

Article 4 and licensing changes council by council, tax and rule changes that affect landlords, and first notice of new free tools. One email a month, written by Kerbio.