EICR rules change on 30 November 2026: sources and the words we relied on Page: https://kerbio.co.uk/eicr-rules-change-30-november-2026/ Checked: 17 November 2026 England only. AMENDING INSTRUMENT: The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) (Amendment) Regulations 2026, SI 2026/1196, made 13 November 2026, published 17 November 2026, in force 30 November 2026: https://www.legislation.gov.uk/uksi/2026/1196/made Preamble: a draft was laid before Parliament and approved by a resolution of each House (section 214(2) Housing and Planning Act 2016). Regulation 3: "In regulation 2, in the definition of "electrical safety standards", for "BS 7671: 2018" substitute "BS 7671:2018+A4:2026"." Regulation 4(b), new regulation 3(1A): "For the purposes of paragraph (1)(c), an inspection and test takes place before a specified tenancy commences if, no more than five years before that time (a) an inspection and test of the electrical installations in the residential premises took place under paragraph (1) and a report was obtained following that inspection and test in accordance with paragraph (3)(a) which is still current; (b) an inspection and test of the electrical installations in the residential premises by a qualified person took place otherwise than under paragraph (1) and a report was provided to the landlord following that inspection and test which is still current." New regulation 3(1B): "For the purposes of paragraph (1A) a report is still current if (a) where the inspection and test took place under paragraph (1), the date given in the report by which the next inspection and test is required has not passed; (b) where the inspection and test did not take place under paragraph (1), any date given in the report by which the next inspection and test should take place has not passed." Regulation 4(e) to (g): "(e) in paragraphs (4), (5) and (8), omit "further investigative or" in each place it occurs; (f) omit paragraph (6); (g) in paragraph (6A), omit "and (6)"." Regulation 5: the same five-year carry-over for registered providers' electrical equipment checks (new regulation 3B(1A) and (1B)). Regulation 8(a): in regulation 10(1)(b), omit "or investigative". Regulation 9 (saving): "The amendments made by regulations 4(e), (f) and (g) and 8(a) are of no effect in relation to an inspection and test that was completed under regulation 3 of the Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020 before 30th November 2026." Explanatory note: "A further such inspection and test is not required if the previous inspection and test took place within the last 5 years and the date specified in the post-inspection report as the date by which the next inspection and test should take place has not passed." The explanatory memorandum for SI 2026/1196 was not served as a document on legislation.gov.uk when this page was written on 17 November 2026 (the memorandum page returned only a contents shell); the explanatory note at the end of the instrument is quoted instead. PRINCIPAL REGULATIONS: The Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020, SI 2020/312, regulation 3 as consolidated (amended by SI 2025/1043): https://www.legislation.gov.uk/uksi/2020/312/regulation/3 Regulation 3(2): "For the purposes of sub-paragraph (1)(b) "at regular intervals" means (a) at intervals of no more than 5 years; or (b) where the most recent report under sub-paragraph (3)(a) requires such inspection and testing to take place by an earlier date, no later than that date." Regulation 3(3)(b): "supply a copy of that report to each existing tenant of the residential premises within 28 days of the inspection and test;" Regulation 3(3)(c): "supply a copy of that report to the local housing authority within 7 days of receiving a request in writing for it from that authority;" Regulation 3(3)(e): "supply a copy of the most recent report to (i) any new tenant under a specified tenancy of premises to which the report relates before that tenant occupies those premises; and (ii) any prospective tenant under a specified tenancy of premises to which the report relates within 28 days of receiving a request in writing for it from that prospective tenant." Regulation 3(4): "Where a report under sub-paragraph (3)(a) indicates that a landlord is or is potentially in breach of the duty under sub-paragraph (1)(a) and the report requires the landlord to undertake further investigative or remedial work, the landlord must ensure that further investigative or remedial work is carried out by a qualified person within (a) 28 days; or (b) the period specified in the report if less than 28 days, starting with the date of the inspection and testing." Regulation 3(5): "Where paragraph (4) applies, a landlord must (a) obtain written confirmation from a qualified person that the further investigative or remedial work has been carried out ... (b) supply that written confirmation, together with a copy of the report ... to each existing tenant of the residential premises within 28 days of completion ... (c) supply that written confirmation ... to the local housing authority within 28 days of completion." Regulation 11: regulation 11 of the 2020 Regulations: the local housing authority may impose a financial penalty of up to £40,000 for a breach of a duty under regulation 3; not amended by SI 2026/1196 (figure as carried on Kerbio's compliance checklist from MHCLG's guidance; regulation 11 was not re-read for this page) GUIDANCE: Electrical safety standards in the private and social rented sectors: guidance: https://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance (MHCLG's guidance page was last updated on 1 November 2025 and did not mention BS 7671:2018+A4:2026 or the 30 November 2026 changes when checked on 17 November 2026; the older landlord guidance page from 2020 named in the radar brief no longer resolves. This page will be updated when the guidance is.)